Passive house · timber frame · Obihiro

Warm all January, from the slab up.

We design and build certified passive houses in larch and spruce for the Tokachi plain. This is the wall of every house we hand over, one layer at a time.

  1. 300 mm of EPS under a 150 mm steel-reinforced raft, poured below the frost line so no cold reaches the floor.

  2. Tokachi larch and spruce studs, cut and pre-assembled as wall panels in our Memuro workshop, raised on site in four days.

  3. 360 mm of cellulose and wood-fibre board, sealed by a taped membrane. Tested at 0.4 air changes per hour at 50 Pa.

  4. Timber tilt-and-turn frames, Uw 0.72, set into the insulation plane and taped so the reveal stays warm to the touch.

  5. Untreated vertical larch on a 30 mm vented batten, left to silver. Snow load and wind drive are handled before the boards go on.

  6. A blower-door test, a heat-recovery unit commissioned room by room, and keys. Heating demand: 14 kWh per m² a year.

Section A–A · external wall 412 mm · U 0.10 W/m²K01 / 06
Concrete being poured over a steel rebar grid for a house slab
01Raft slab · 300 mm EPS
Timber wall frame of a house standing on scaffolding against a clear sky
02Frame · larch and spruce panels
Wall cavity filled with insulation around a timber window opening
03Insulation · 360 mm, taped membrane
Timber-framed tilt-and-turn window seen from inside, autumn trees beyond
04Windows · triple glazed, Uw 0.72
Vertical larch board cladding and a deep-set window on a house facade
05Cladding · vented larch boards
Larch-clad house with tall glazed gable among snowy birch trees
06Handed over · Shikaoi, February 2025
Heating cost per winter · Obihiro climate · heat at ¥14 per kWh
Drag to your planned size — the three houses below are recalculated.
House built to the 1999 standard · 180 kWh/m²a
¥277,200
House built to the 2016 standard · 90 kWh/m²a
¥138,600
Karamatsu passive house · 14 kWh/m²a
¥21,600

Same plot, same family, same winter: 92 % less to heat than a house built to the 1999 standard.

Heating cost comparison

The cheapest heater is the wall you already paid for.

Figures use measured heating demand from our last nine houses against the national standards they replace, at 2025 kerosene and heat-pump prices in Tokachi. Hot water and appliances are not included.

Long single-storey timber house with floor-to-ceiling glazing and a deckCase study · handed over 2025Memuro House118 m² · one storey · ¥36.6M fixed price · January heating ¥4,100Read the case study →

Finished homes

Houses already lived through a winter.

Otofuke House2024 · 132 m²
Dark-clad timber house with a wide deck on a snowy slope

Two storeys for a family of five on a south slope, charred-larch cladding and a deck that clears its own snow. Fixed price ¥41.2M; first-winter heating ¥26,800.

Ask for a house like this →
Makubetsu Hill House2023 · 104 m²
Timber house glowing warm at night above a snowy valley

A compact house for a retired couple, built into the hill with the bedroom on the warm side. Fixed price ¥33.4M; the heat pump runs about 40 days a year.

Ask for a house like this →
Nakasatsunai Farmhouse2024 · 146 m²
Warm kitchen counter with timber stools in low winter sun

A farming family's new house beside their bean fields: one long kitchen where the low sun reaches the back wall in December. Fixed price ¥44.9M.

Ask for a house like this →
All finished homes
Timber-lined corner room with shelves, plants and a window seat chair

Shimizu Studio HouseSpruce lining, 6:40 on a February morning. Outside −19 °C, inside 20.8 °C, heater off since midnight.

Inside, at −20 °C outside

Sit by the window in February.

Every room
20–22 °C, day and night
Window surface
17 °C on the inner pane
Fresh air
Filtered, every room, 88 % of heat kept
Humidity
40–50 %, no condensation
Heater
One small heat pump for the house

From first call to keys in about fourteen months.

Every step and its cost →
  1. Month 0Plot visitWe walk the plot with you, check sun, snow drift and ground, free of charge.
  2. Months 1–3Design and energy modelPlans drawn with you, every room checked in the passive-house model.
  3. Month 4Fixed priceOne contract figure, valid for the whole build. No allowances.
  4. Months 6–9Slab and workshopSlab poured before the frost; walls made indoors in Memuro.
  5. Months 10–14Raise, close, finishFrame up in four days, blower-door test, then keys.
House frame with roof trusses rising behind scaffolding
Day three of a four-day raise · roof trusses go on before the first snow.
Birch trunks in a row above fresh snow
“Our old house in Obihiro burned eighteen cans of kerosene a winter. This one, we forgot to switch the heater on until the end of November.”
Yui and Kenta Hosokawa · Memuro House, first winter
December
¥3,600
January
¥4,100
February
¥3,900
Open field disappearing into falling snow

Plots, budgets, first questions

Tell us where your plot is.

Two answers and an email. Rie or Daichi replies within two working days with a first cost range for your plot.

Planning in more detail? Use the full form · Read what follows your request